SF Transbay Piling series
tight ringed, mud soaked and rustic pilings were yanked out of the SF Bay area mud by the tips and became the focus of our table serieS DESIGNED TO HIGHLIGHT THE WOODS UTILITARIAN GRACE.
.
A long time ago, around the time our declaration of independence was being signed in the 1700's, the forests of the pacific northwest slowly inched skyward. In the 1930's hundreds of the straightest of those trees were harvested and pounded into the estuarial bay mud to hold the first Transbay terminal over an old swamp. When time came to tear out and build higher, we saved as many as we could. All designs easily customized to fit your exact needs. 4-8 week lead times.



